2009年8月10日 星期一

IEEE 1058 標準專案計劃書撰寫格式

軟體計劃書的撰寫格式並沒有一定的規則,但大部份的人還是會選擇依循 IEEE 1058 的標準文件格式,下面就是它的原文格式:


Title Page
Signature Page
Change History
Preface
Table of contents
List of figures
List of tables
SECTION 1. OVERVIEW
1.1 Project Summary
1.1.1 Purpose, Scope, and Objectives
1.1.2 Assumptions and Constraints
1.1.3 Project Deliverables
1.1.4 Master Schedule and Budget Summary
1.2 Evolution of the Plan
1.3 Document Structure
SECTION 2. REFERENCES
2.1 Standards and Documents
2.2 Deviations and Waivers
SECTION 3. DEFINITIONS
SECTION 4. PROJECT ORGANIZATION
4.1 External Interfaces
4.2 Internal Structure
4.2.1 The Project Manager
4.2.1.1 Scope of Authority
4.2.1.2 Scope of Responsibility
4.2.1.3 Internal Responsibilities
4.2.1.4 External Responsibilities
4.3 Project Roles and Responsibilities
SECTION 5. MANAGEMENT PROCESS
5.1 Start-up
5.1.1 Estimation
5.1.2 Staffing
5.1.3 Resource Acquisition
5.1.4 Staff Training
5.2 Work Planning
5.2.1 Work Activities
5.2.2 Schedule Allocation
5.2.3 Resource Allocation
5.2.4 Budget Allocation
5.3 Project Controls
5.3.1 Requirements Control
5.3.2 Schedule Control
5.3.2.1 Schedule Tracking.
5.3.2.2 Schedule Performance Reports
5.3.2.3 Schedule Reviews
5.3.2.4 Progress Variance Monitoring
5.3.2.5 Progress Variance Resolution
5.3.2.6 Follow Up on Corrective Action
5.3.3 Budget Control
5.3.3.1 Cost Management
5.3.3.2 Methods to Ensure Cost Adherence
5.3.3.3 Cost Control
5.3.3.4 Contractor Cost Control
5.3.3.5 Cost Variance Measurement
5.3.3.6 Cost Variance Corrective Action
5.3.4 Quality Control
5.3.5 Project Reporting and Communication
5.3.5.1 Electronic Media
5.3.5.2 Meetings
5.3.5.3 Information Repository
5.3.5.4 Internal Reviews
5.3.5.5 Status Reporting
5.3.6 Metrics Collection
5.4 Risk Management
5.5 Project Closeout
SECTION 6. TECHNICAL PROCESS
6.1 Process Model
6.2 Methods, Tools and Techniques
6.3 Project Infrastructure
6.4 Product Acceptance
SECTION 7. SUPPORTING PROCESSES
7.1 Configuration Management
7.2 Independent Verification and Validation
7.3 Documentation
7.4 Quality Assurance
7.5 Reviews and Audits
7.6 Problem Resolution
7.6.1 TRB Membership
7.6.2 TRB Chairperson
7.7 Contractor Management
7.7.1 Contracting Process
7.7.2 Contractor Performance Monitoring
7.8 Process Improvement
7.8.1 Systems/Software Process Improvement Lead
7.8.2 Systems Engineering Process Group
8. ADDITIONAL PLANS
Appendices

沒有留言: